Case Studies

12

MOT Centre: A car sales business were looking to branch out into servicing and MOT’s, we were approached with specifications and assisted with the groundwork also.  Our building has definitely added value to this growing company.  From completion of groundwork the building was in full use within 3 weeks.

Agricultural Store: Slightly different to most work taken on, we were requested to supply an agricultural store for a customer who had an existing block dwarf wall.  After some amendments to the wall to enable our building to sit onsite the building was completed in 5 days to a very high standard.

General Store: Our erection team enjoyed some fantastic weather whilst erecting this general storage facility.  The client had seen some building examples on our website and requested his structure to look the same as one of these, again this structure was completed in under a week from start to finish, another delighted customer.

Macklin Motors: Our client required a valeting and wash bay to compliment their existing sales and workshop facilities.  The open bay with Perspex sides allows the wash bay personnel to freely power wash the vehicles whilst the valeting bay is kept dry where polishing can be carried out at the same time.  A very cost effective solution which enables our client to prepare cars for sale.

College: Sports Storage Facility: Having already supplied this college with a storage building in 2012 our excellent product and services were well known to them.  This structure was required for sports field equipment and maintenance equipment storage, from point of order to completion within 6 weeks our client is very happy with the finished product.

College: Swimming Pool Enclosure: Another college in the UK required a building to cover a swimming pool which was due to be refurbished and brought back to life. Space was at a minimum therefore work onsite was carried out with extreme care.  Usually our buildings can be erected without the use of expensive plant; unfortunately in this case there was no option but to have a crane onsite for 2 days.  Erection costs were kept to a minimum and work completed within schedule.

Caravan Store: Having been introduced to our company by a friend this client already knew of our products and services.  Spec here was to create a building to enable storage and maintenance of caravans, whilst not impacting too much on the surroundings.  Our building was the perfect answer and was completed within a week to the highest standards, as expected by our customers.

Citroen Dealership: Our client required a cost effective building to enable small vehicle repairs and valeting of their cars. Our building proved to be the most attractive solution for our client. We provided groundwork services whilst the building components were being manufactured and our erection team were onsite to begin work upon delivery, from placement of order the structure was handed over within six weeks. We have since provided further buildings to the dealership.

Storage Units: Storage Units: This is now the third identical building that we have provided for this customer, which allows their business to generate an income from the rentable units. Due to the huge success from each of these three units we have been informed that a third will be required very soon.

Cemex: Cement plant in need of a large storage facility; a 22m x 56m x 6m single skin structure was specified and again our building and erection services were the most cost effective option for Cemex.  Another satisfied customer who has also required further buildings from us since the completion of the main building.